    #21
    Parašė spirit Rodyti pranešimą
    pzlotnik, what about the other infrastructure projects in Poznan, like roads, railway?
    OK, this thread is for city transport, but buses, trains and trams use also infrastructure.

    The most important is road network surrounding Poznań.

    A2 Highway exists on eastern and wetern direction form Poznań. Already is being built section between Nowy Tomyśl (A2 Poznań - Nowy Tomyśl already exists 56 km) and German border in Świecko -> total lenght 105 km. Construction started in August 2009 and highway will be opened in Nov 2011.
















    [/QUOTE]

    Photos from: http://www.skyscrapercity.com/showpo...postcount=2362

    Next inportant project was modernisation junction A2 Highawy with city center. Głogowska street was opened in autumn 2009:











    Source: http://www.skyscrapercity.com/showpo...postcount=1091

    They build infrastructure around stadium and airport, among them Bułgarska street has just been modernized - upgreade to 4 lanes:

    [/QUOTE]

    From: http://www.skyscrapercity.com/showpo...&postcount=518


    S11 expressway was completly rebuilt. Constrution on 25 km form Poznań to Kórnik bypass finished in summer 2009:

























    Source: http://www.skyscrapercity.com/showpo...postcount=1283

    Lechicka steer was also upgreaded to 4 lanes, although only part was finished. It was opened in Dec 2009:

























    [/QUOTE]

    Source: http://www.skyscrapercity.com/showpo...&postcount=190


    Poznań railway junction reconstruction finished in summer 2009 and costed over 100 mio EUR:

















































    Part of S11 Expressway - Poznań West Bypass is under construtcion - 4 lane 2 separate roads expressway, 28 km length. Opening date May 2012:







    pomiędzy WD 19 a w. Zakrzewo




    w. Zakrzewo








    There are many more constuction places in Poznań and around. I will mention Bukowska Street - connecting airport with stadium - upgrade for 4 lane, 2 roads. Also S5 Expressway - East Poznań Bypass connection Poznań and Gniezno - 45 km lenght.
    Paskutinis taisė pzlotnik; 2010.01.25, 19:32.

    Comment


      #22
      Nice. And one more thing - don't put so many photo's in one message. It's killing those who have slow internet It would be better if you would put about 5-7 photo's in message, like we do in other threats here
      You might surprise yourself.

      Miestai.net FB

      Comment


        #23
        Parašė spirit Rodyti pranešimą
        Nice. And one more thing - don't put so many photo's in one message. It's killing those who have slow internet It would be better if you would put about 5-7 photo's in message, like we do in other threats here
        Good notice, also the size of photos should be in 800x600 resolution. Because this size are the greatest to review.

        Comment


          #24
          Sorry Guys, I was posting that photos from other source like SCC Forum (You ve got direct links to them) so size may be different.

          In the future I will post no more than 5 - 10 photos per message.

          I work on 2 Mbit/s network and it`s OK -server hosting those photos are international.

          Comment


            #25
            On this map You can see those roads around Poznań I mentioned in the message above: Highway A2, expressways S11 (West Poznan Bypass, Poznan - Kórnik section) and S5 (Poznan - Gniezno Section):



            Black-existing
            Orange-under construction
            Green-tender process
            Blue-agreement signed
            Yellow-tender in 2010
            White-preparation process

            Comment


              #26
              Railway station will be modernized. It should be done before Euro 2012, but in my opinion the delay is too big to finalize construction on time. This is visualisation of new communication center in Poznań (Railway and Bus station with hotels, retail center and office space). Railway station will be constucted first. Trigranit Development was chosen to build this:



              But it will be build until 2014 for sure.

              Polish Railways statement in Google Translation :-)

              PKP SA TriGranit prepare and build a new main railway station poznan
              Polish State Railways SA approaching the end of negotiations with investors interested in building a new Integrated Transport Center Chief Poznan. PKP SA conduct final negotiations with a consortium of TriGranit.

              Negotiations are currently underway detailed records of an investment agreement with a developer. - Says Pawel Olczyk - Member of the Board of PKP SA Director of Property Management.

              The investment is being prepared by PKP SA since 2007. In preparing the guidelines, land use, where the current main station in Poznan, Poznan City also participated.

              Negotiations with investors started in September 2008. They relate to ambitious and difficult investment of several hundred million zlotys in the center of one of the largest Polish cities - says Paweł Olczyk.

              Schedule of forthcoming investment is not compromised. It assumes the start of construction of a new railway station in 2010. Detailed agreement with the investor at this time will benefit from the pace of the preparatory work after signing an investment agreement.

              The investment will transform the current site's main railway station hub integrating buses, trains and trams, including Poznań Fast Tram. In addition to the station there will also be new areas for passengers, including parking areas, shopping and entertainment. In the next stages of investment also rise offices and residential apartments.

              TriGranit Development Corporation operates in Poland since 2003. The company is one of the developers operating in Central and Eastern Europe and operates in the property market since 1997. TriGranit executed projects in Budapest, Bratislava, Prague and Katowice. The total value of the investment projects of over EUR 2 billion. 12 November 2009 TriGranit put away the enjoyment Bonarka mall in Krakow with a total pow. approximately 250 thousand square meters and the value of 250 million.
              Paskutinis taisė pzlotnik; 2010.01.26, 19:39.

              Comment


                #27
                Modernization of regional railways in Poznań

                Poznań has a population of 570 000, but metro area is 1 000 000. Wielopolska Region where Poznań is capital has a population of 3 403 174 (slightly more than Lithuania on area 29 826,51 km² - two times less than Lithuania). Many people work in Poznań but live outside the city - so modernization is needed.
                There will be modernized lines like:

                1) Poznan East - Wągrowiec
                2) Wolsztyn - Luboń

                Total cost almost 300 000 000 PLN (253 mio Lits)

                Poznan: a tender to modernize the regional railway lines

                In October, the Office of the Marshal of the Wielkopolska Region, signed with the beneficiary of PKP PLK Regional Branch in Poznań agreement to finance modernization projects of regional railway lines from Poznan to Wągrowiec and Wolsztyn. This makes it possible was the announcement of tenders for the modernization of the routes.

                Just a few days ago, 9 November 2009 the investigation has been launched for public procurement in an open tender procedure for the design and execution of works covered by the task mo. "Modernization of the railway line No 356 East Poznan - Bydgoszcz in the Wielkopolska province which has a high importance in handling calls from the agglomeration of small towns on the section Poznan Poznan East - Gołańcz - Phase I" (Poznan East - Wągrowiec). The total value of this project is 175 192 000.00 zł, receive support from the Wielkopolska Regional Operational Program has been set at 76.83%, ie 109 992 216.00 zł.

                In turn, announced November 13 the proceedings of a public contract in an open tender procedure for the design and execution of the works is a project entitled. "Modernization of the railway line No 357 Sulechów - Lubon the terni Wielkopolska province which has a high importance to handling calls from the small town of Poznan agglomeration on the section Wolsztyn - Luboń. The total value of this project is 118 632 439.73 zł, a grant from the Wielkopolska Regional Operational Program has been established in the amount of 76.7%, ie 74 455 780.00 zł. Modernization projects of regional railway lines to Wolsztyn Wągrowiec and are among the largest railway modernization projects implemented under the regional operational programs across the country.

                These are key projects that the decision of the Board of the Wielkopolska Region have been selected to receive support from the European Regional Development Fund under Action 2.3 "Modernization of the regional rail system" of the Wielkopolska Regional Operational Program for the period 2007 - 2013. Projects will be implemented during 2010 - 2012 by PKP Polish Railway Lines Company Regional Branch in Poznań.

                Comment


                  #28







                  Poznań has 15 such railbuses serving for regional lines (route not longer than 60 km). Maximum speed is 120 km/h. All produced in Poland by ZNTK Poznań or PESA Bydgoszcz.
                  Paskutinis taisė pzlotnik; 2010.01.26, 20:07.

                  Comment


                    #29
                    Poznań Fast Tram Extention

                    Until 2012 Poznań Fast Tram Line will be extended to Railway station. Construction starts this year.



                    Green - existing line and stops
                    Red - extention of line.


                    From above (new line marked red, existing green - as you see it becomes normal train when reaches Roosevelt street):



                    Closer look (I marked new tram tracks).




                    There will be build over 2 km of new line which will be under street level - like railway tracks.


                    Total cost - over 200 million PLN.
                    Paskutinis taisė pzlotnik; 2010.01.28, 19:44.

                    Comment


                      #30
                      Poznań railway junction modernization

                      As I mentioned before (and posted some photos) Poznań railway junction has lately been modernized.

                      The project included upgrading 21-kilometer section of the station by Swarzedz Antoninek Poznan, Poznan East Garbary Poznan, Poznan Glowny, Poznan Górczyn to stop a person Poznan Junikowo.

                      Map of modernization:



                      Pink coloured line was modernized.

                      The scope of the modernization of the line included:

                      * Modernization of signaling equipment (SCR)
                      * Modernization of railroad,
                      * Modernization of the rail surface and substructure,
                      * Modernization of the electricity supply and catenary,
                      * Modernization of facilities engineering and engineering.



                      Completed the modernization of Poznan node. The result is: greater bandwidth and improve security line train. Movement is managed by the Local Computer Control Center (LCS).


                      Local Computer Control Center (LCS)

                      In Poznan, ended one of the biggest investments in railway networks in post-war Poland - Poznan junction modernization (PWk) line E20 from Swarzędz in Poznan Junikowo (23 km). Its total cost was around 105 million euros, of which 75 per cent. was a co-financing from the Cohesion Fund, the rest came from the state budget. The task was a huge challenge for the railroad, which on the one hand limited short period of its implementation, on the other hand - the need to maintain the movement of trains during the exercise works. And yet the Poznan Central each day passes more than half a thousand trains! Railway parcel regularly informs readers about the course of modernization. Recall, therefore, only briefly, that the investment is divided into 4 contracts. The first concerned the design and construction of a signaling system. The second contract was divided into three flights: Flight A - pavement and substructure works, bridges and viaducts, Flight B - implementing a system for power and traction network, flight C - Construction of two-level crossings in Swarzedz. The third contract involved the preparation of tender documentation and design, and the fourth included the supervision of investments, namely the Project Engineer. The work undertaken in June 2006 and was completed in January 2009, modernized the following infrastructure: signaling (SRK), track layout, surface and substructure railway, electricity supply and rail network, engineering and facilities engineering.

                      Wstrzelić the gap

                      The most serious and also very complicated task was the modernization development and launch of the Local Control Center. With this system, orderlies traffic, instead of adjusting several posts, work in one LCS and hence control the traffic on the six stations modernized node.
                      - Liquidated possessing signal towers and regulations. Setting and a total of 16 posts have replaced the control center, which is located about half a kilometer from the main building of the station poznan - tells SIEWIERA Gregory, Deputy General Director of Regional Branch of PKP Polish Railway Lines SA in Poznan. The first connection of signaling equipment for the new control center was carried out at the end of November 2007, launched from the Poznan Central Station. This pioneering operation has involved a number of problems ... and without delays in train traffic. Railwaymen quickly learned from their mistakes and connecting the next station been more efficient. Sometimes, however, that the team several times to take the trouble to switch devices, such as Swarzedz, where he experienced the difficulties of matching systems. LCS arose gradually, initially consisted of experts from the track works, then installed the device srk and only at the end of the device connected to the LCS srk. Connecting the last station poznan Górczyn was 16 January 2009, control is now in full with the LCS, but there are also alternative security emergency.
                      - At any time, if necessary, for example, if the severed cables and the DPP was not possible to control the traffic, we are able to move the motion control of the DPP to one of three stations: Swarzedz, Poznan and Poznan Górczyn East - provides Breschan Arnold, head of the modernization contract Poznan railway junction in the Regional Branch of PKP PLK SA in Poznan. Turning next to the DPP at the station next to the train speeding out of the question. Railwaymen well nagłowili therefore, to find a break in kursowaniu trains. The first time "wstrzelili a" two-hour gap in the night, then searched the rest of the day.

                      Placed 80.5 kilometers of new rail

                      LCS is safe

                      Difficulties in mounting the DPP is not limited to the fight against time. Tender for the system for signaling won two different companies offering two separate systems. These systems at some point had to be combined into a single software, operating reliably and without complaint, because it comes to human safety. Swarzedz stations, Poznan East Garbary Poznan, Poznan Antoninek installed software Ebilock Bombardier 950, while in Poznan and Poznan main Górczynie - Program ESTW L90 5 Thales. From the outset there were concerns that the system will cooperated. It turned out that work together perfectly. Railwaymen emphasize that success is the agreement the two companies that have aligned the two systems so that they are compatible. Investment in the railway ran from the Poznan branch of the Regional PLK, but also participated in the railway employees of the establishments. - I want to emphasize the contribution of several dozen workers, mostly from the Poznań Department of Railways PKP PLK SA and the Green Mountains, who in addition to their regular duties, worked with przełączeniach and withdrawals. It happened that, in parallel to work 2 - 3 reception committees. We owe the success of this task and colleagues of life - stresses the director SIEWIERA. Currently, the operation of the modernized infrastructure is the responsibility of the Department of Railways in Poznan. Poznan LCS is a good starting point - the future is likely to evolve into the Regional Control Center. For future investments - modernization of the E 59 (Wroclaw - Poznan - Szczecin) and E 20/CE 20 (Warsaw - Rzepin) - the next station will be connected to the center, it is possible to connect an already existing VCT in Opalenica. Benefit from the operation of modern LCS, in addition to ensure the full safety of trains, is visible to the naked eye. Just watch the trains at the station, when one enters the second immediately departs in the opposite direction. Once, it took several minutes because of traffic officer on duty had to confirm the arrival of the train and ordered a route for the moving vehicle, etc. Today, the movement of trains is observed on the monitor screen, and computer controlled devices.

                      One traction substation
                      In Poznan, for years there were problems with insufficient power. Poznan Central Station had the old distribution system, based on pre-war even the power supply with a voltage of 6 / 0, 4 kV, consisting of 8 stations entered the main transformer station, distribution system. Modernization of the Poznan node was an excellent opportunity to solve the problem. In place of the existing substation created one, and the old power system has been replaced new. Switching to the new system took place at the turn of 2008/2009, was a long and complicated process.
                      - The reconstruction of Poznan node eliminating the old substation was designed with the whole power supply system and construction of a new distribution system supplied from the MV line needs no traction voltage of 15 kV. The project entered the construction of a new traction substations Poznan Glowny, with a capacity of 5.6 MW of connectivity as an energy source for the system SN - Breschan Arnold explains.
                      - Equipment prepared at the 9.5 MW of power, thinking also about ensuring
                      sufficient power supply to the line E 59 after its modernization. MV distribution system in Poznan Central Station will be powered from 3 sources: Traction substations (PT) Poznan Glowny, PT and PT Swarzedz Rudnicze connected by a line needs no traction - he says. A director Gregory SIEWIERA adds: - We had big problems with the rip in the company ENEA, it is true "Peelka" was an investor, but were involved in the task of ENEA and PKP Power. Besides the difficulties experienced in bringing the power of the GPZ Jezyce (Point Power Station), as Poznan Municipal Roads allow for the closure Grunwaldzka street only in the summer and only then we begin to work. However poradziliśmy itself, and a new substation is working, but at the same time the inhabitants of Poznan have not seen any major problems. Works were completed in Poznan node. As after every large investment, you must still clean up. Leads to finishing works and okołotorowe, removes the old foundations, paints a catenary structures, removes the defects identified in withdrawals, settlement of investment continues.

                      Overpass on Zawadach
                      Construction of the new viaduct, after which the tracks run in Poznan node, coincided with the modernization PWk. Overpass is a separate investment made by the Municipal Roads in Poznan. However, since the facility was built, the railway wanted to minimize the impact of work on the viaduct for the modernization of the node and rip works with both investment that then no longer interfere with the upgraded rail infrastructure.
                      - We wanted that the work on the viaduct in as little as reflected in the works on the node. Partially succeeded, at the time that we stop the movement of trains on track 1, ZDM has built part of the viaduct. Unfortunately, the earlier road builders have not used the time for the closing track No 2 Eventually we managed to communicate, not to destroy them, and our work - the director explains SIEWIERA. The ZDM set the deadline for the completion of investments at 15 February. Then there was a twin-track the restoration of traffic on the section from east to Poznan Poznan Square. Since then, the trains - as planned - no longer drive a roundabout way.


                      Gregory SIEWIERA, Deputy Director-General of PKP PLK SA Regional Branch in Poznań concludes:
                      - Modernization of the Poznan node is the first of this type of investment that we made on such a large area in such a short period of time. In addition to the initial perturbations go without major disruption to travelers. Success was through the carriers, who kept publishing timetable prepared for each stage of construction, information was available in the media, hangs posters, updated online schedules.

                      I want to emphasize the role Ekspozytury Rail Traffic Management in developing an operational timetables and directing train movement. We are thankful to ex-Rolling Stock Factory in Poznan, who patiently endured the inconvenience, what he zaserwowaliśmy. I mean the temporary exclusion of a point rewidenckiego to review current electric locomotives. Investment we have closed on time, without major disruption, thanks to his personal commitment and cooperation of colleagues from different railway companies. Thank you for your patience and passengers to understand that treated the issue of modernization of Poznan node. Highly appreciate the kindness of the media on this issue.















                      * Translation by Google
                      Paskutinis taisė pzlotnik; 2010.01.27, 20:24.

                      Comment


                        #31
                        For Euro 2012 we will have a new station

                        http://poznan.gazeta.pl/poznan/1,36001,7502111.html

                        For Euro 2012 we will have a new station


                        - At 99 percent on the Euro 2012 the new station will be ready - he says, "Gazeta" Grzegorz Tomaszewski, Project Director in the Office of Strategic Real Estate PKP.

                        MPK bus drives up the street. Railway station, bus route extended PST seventh on the platform, the taxi "throws" of customers on the platform of the bridge linking Dworcowy and passengers from the coach bus shedding on one of the 16 posts at the new terminal to the station - the building with a semicircular glass roof. A driver? Those are no problem parking space in off-Freight in the new street leading to the huge car park behind the station.

                        Tickets can be purchased at one of 10 cash or tickets machines. How do you still have time to train, look at the small shopping gallery, which is located under one roof, with part of passengers.

                        Hall station and shops, is located at the bridge Dworcowego, so the platform must exit escalator. And there, surprise - a brand new elevated platform, which is easier to board a train, aesthetic shelters, benches. And despite the torrential rain in the tunnel connecting the platforms has finally puddles, because the railway podłączyli rainwater to drain the Hetmańska.

                        Oh, to think that two years ago it all looked like ... Well, let's say otherwise. And they were afraid that, at the Euro najemy to shame before the guests from abroad. And here please - railroad promised that by 1 April 2012 will be a new station. And it is.

                        Railway Station: The Euros have time

                        Enough of these dreams? What dreams! - At 99 percent on the Euro 2012 the new station will be ready - he says, "Gazeta" Grzegorz Tomaszewski, Project Director in the Office of Strategic Real Estate PKP. - I know that many people have already placed a cross at the Poznan railroad station, because really the whole selection process took a long time investor. The situation is complicated, however, the crisis on the real estate market, the company had problems in providing the financing - explains.

                        No More delays . Railwaymen assume that in early February to sign a contract with a company TriGranit, which will build the new station. Railway tie with the investor company, which raises land. TriGranit will put up the money. And it is considerable. Has built on its cost of building the railway station, bus terminal, parking and new access roads to the facility.

                        Top investment - this year, the time put into service - April 2012. The investor will have 14 months to build, excluding the winter. Cost? 40 million EUR. And this is just the beginning, because eventually (after the Euro), the gallery business grows to the parameters of a large shopping mall, and on the west side office grow, investment in railway land will be worth even 170 million EUR.

                        Old for the demolition

                        What happens to the building of the current station? Until the launch of a new anything. UEFA Euro could serve as a place where fans will be gathered. Later be demolished. - It is covered by the conservator's protection, but not placed on the register of monuments. We agree conservator for demolition after the previously detailed photographic documentation - says Tomaszewski.

                        In place of the old station is eventually built the hotel. And before him, rather than today's car park, as requested by the Historic Preservation will be square with greenery, MPK bus stop and driveway for the hotel guests.

                        Platforms to be restored

                        Although the first serious work on the new station we will have to wait until the second half of the year, they now seem to be the first Movie change. Took the railway for repairs platforms. At first the fire goes first, second and third - it was on them will be part of the station associated with the passenger service.

                        Construction of the new main train station, it will force changes in communications in this part of town. Will be a new access street. Dworcowy component under the bridge. Before entering the bridge from the street. Queen Jadwiga, at the junction of Freight is planned to enable the roundabout exit onto the street leading to new parking lots for the station. Perhaps, too, that on the platform, which will connect the bridge Dworcowy the terminal will be built bay, for example, taxis serving.

                        Schema:


                        1) Old station
                        2 & 3 ) New Station
                        4) New Station surroundings where big shopping mall and underground parking will be build
                        5) platform from Dworcowy viaduct to new station
                        6) New roundabout
                        7) extended Poznań Fast Tram Line

                        The old station marked blue, new one red:



                        Now it looks poorly, but in 30 months it will change a lot.

                        Railway Station is located in the heart of the city (withe&blue point):


                        There is a big area right to the station called Free Tracks, which will be revitalized. Building new station with shopping mall and office space is the first step to make that part of the city fine.
                        Paskutinis taisė pzlotnik; 2010.01.28, 22:20.

                        Comment


                          #32
                          Parašė pzlotnik Rodyti pranešimą
                          Atvaizdas


                          Poznań has 15 such railbuses serving for regional lines (route not longer than 60 km). Maximum speed is 120 km/h. All produced in Poland by ZNTK Poznań or PESA Bydgoszcz.
                          I would like if Poznan bought such trains for metro connections: (Warsaw has just bouhgt 4 such trains).









                          They are made in Poland by Newwag : http://www.newag.pl/index.php?a=ofer...=53&opcja=show

                          Polish PESA makes also interesting trains:

                          Paskutinis taisė pzlotnik; 2010.01.29, 20:47.

                          Comment


                            #33
                            Tram on Franowo: we have millions, do not have time

                            As I posted in this thread that new line from Poznań center to Rataje commieblock district was built in 2007 and went into operation form september 2007. This line will be extended to IKEA megastore.:



                            Green - existing line
                            Orange - new line (opening 2012)

                            Company Infrastructure Poznan Euro 2012 on Tuesday (OCt. 2009) signed a contract for the design of the new tram route to Franowo. I will keep our fingers crossed that the selected firm as soon as possible done its job. Because otherwise it will be difficult to build a track for Euro 2012.
                            The game is played for high stakes. It is about an investment worth around 310 million PLN (260 million LIT), for which we have provided 108 million PLN of EU funding .

                            IEP 2012 the company depends on the time of at least two reasons. First, he wants to hurry MPK, which for several months designing the Franowie tram depot. The point is that both tracks and the depot was built at the same time. Secondly, if the project route earlier uprising, the chances that its construction has started for next year. And that's really the last bell if you want to ride the tram Franowo before Euro 2012. Contractor and will remain so because only a few months to build. - We have no choice, the route must be ready in the first quarter of 2012 - says Christina Rakowska, vice president of the company's infrastructure Poznan Euro 2012, which is responsible for several investments in European Football championships. To shorten up the preparations for the investment of the designer obarczono also the duty to obtain a building permit.
                            But there is a carrot. - Designers are in accordance with the agreement of 12 months for the execution of documentation, but we want to have time to do it earlier - he says Rakowska. - The incentive is a bonus in the form of 6 percent. contract value for each month of speed - he adds. The contract is valued at 3.26 million zł, so the designers had to comply with duties such as 2 months faster, then their account would affect nearly 400 thousand. zł more. The premium powalczy selected in the tender a consortium of leading design offices, PXM company from Cracow at the head.

                            The route to Franowo be a de facto extension built two years ago, a new route across the bridge St. Roh to Rataje. The construction of a section of track with a loop on the person. Lech Franowo district residents to settlements on the outskirts Rataj waiting for years. The planned route is approximately 2.5 km of track that will run an existing tunnel under the street. Chartowo and then in the trench along the street. Piasnickie shopping center in the direction of the M1. Another tram tunnel driven into the street. KURLANDZKA and the IKEA store will go up to the surface. Continue between the buildings, IKEA and M1 arrives at KP's rear areas, where the emergence of the loop and the tram depot parking places for 100 trams. On the new route created three pairs of stops: at the height of the person ryneczku. Rusa, the Kurlandzka and between IKEA and the M1.

                            Comment


                              #34
                              Combino crash

                              On thursday 28.01.2010 combino had a crash with Iveco car.





                              Tram driver and car driver were injured, tram passangers were ok.

                              Comment


                                #35
                                Great supply of green "Dachshunds"


                                green "Dachshunds"

                                News from 02.12.2009

                                Still going in 25 modern, low floor equipped with air conditioning and monitoring, comfortable buses, and has already been resolved following a tender for the purchase of 75 such vehicles. The auction proved to be the best company Solaris, which proposed the lowest price in the competition and won the highest number of points. Nearly 80 percent of eligible project costs managed to acquire the EU funds.

                                The tender was announced two months ago - September 25, but already this spring MPK Poznan attempted to obtain grants from European Union funds.
                                - We decided to purchase 75 new buses with the highest standard: 30 short, 12-meter and 45 articulated about 18 meters long - says Wojciech Tulibacki, CEO MPK Poznan Sp. z oo - The low-floor vehicles, clean, equipped with engines meeting the highest standards of exhaust emissions from internal monitoring system and all facilities for disabled people, with air conditioning throughout the vehicle and a special fire prevention, in addition, will have its board ticket vending machines ..

                                An application for funds from the EU has been submitted on the 8th of May and after passing through a two-stage evaluation of formal and substantive found in the list of projects being considered for funding.
                                September 7, 2009 between the Executive Board of the Wielkopolska Region and City Enterprise communication in Poznan has signed an agreement to finance the purchase of new rolling stock from the European Regional Development Fund under the action 2.2 "Development of urban transport of the Wielkopolska Regional Operational Program 2007-2013.

                                - We played about 58.8 million zł which is up 80 percent of eligible project costs. And we made it! ... - With satisfaction, "says Krzysztof Książyk, director of bus transport.
                                November 9 saw the opening of bids, and yesterday, December 1, after a thorough evaluation of proposals Solaris, MAN, Volvo and Kapena's, came to the allotment.

                                Best and cheapest offer by the company Solaris Bus & Coach.

                                - The most important criterion was the price, but the tender committee also took into account the technical and operational characteristics that determine the travel comfort - added cond. Książyk. - Bulleted were also conditions for the guarantee conditions of service and technical readiness.
                                The value of the contract proposed by the Solaris is just over 76 million 665 thousand zlotys. MAN's offer was slightly more expensive - 77 million 169 thousand zloty, while the Volvo buses would cost nearly 93 million zł. On formal grounds proved to be valid firm offer Kapena.

                                Comment


                                  #36
                                  Poznań will start to change for new ones "old" low floor buses bought 10 - 12 years ago...(MAN and Neoplan) after delivering new 75 buses. In 2009 30 new buses were bought and 75 new will be delivered in 2010 - 2011 (the contract I wrote about above).

                                  The best is that all new buses and trams that are being delivered to Poznań form 2008 are equipped in air conditioning system.

                                  Comment


                                    #37
                                    Pre production Tramino tramway made by SOLARIS without some side covers - drive elements can be seen. 40 such train will be delivered by SOLARIS for Poznań city by the end of 2012.

                                    Photos made on tramway depot in Poznań on Głogowska street. Photos made 4th of march 2010.












                                    Photos source: http://www.skyscrapercity.com/showpo...postcount=1690
                                    Paskutinis taisė pzlotnik; 2010.03.17, 20:29.

                                    Comment


                                      #38
                                      Kaponiera after repair - Visualization

                                      We already know how it will look like after redevelopment Kaponiera Rondo with a stopover in Poznan stones on her extended tour to the train station. Vice-President of Poznan City Miroslaw Kruszynski and restorer Maria Strzałko finally accepted the architectural design.

                                      The underground caponiere will have two levels. From Ronda you can go to the Fast Tram stop. He also planned to place at the café, kiosk and point of information transport. Change the appearance of the University Bridge, which will be glazed exit from the roundabout and stop stones.

                                      "It is to be the principal place of interchange in the heart" - said Vice President Miroslaw Kruszynski. In his opinion, adopted the concept does not obscure the building of the university viewed from the side of the Mercure Hotel, the most convenience will be a direct connection with the escalators to the platforms of railway bridge University without going through Kaponiera. The reconstruction will be used such materials as glass, concrete and granite slabs - mark Kruszynski.

                                      Poznań Fast Tram will enter the current platform, 7-station but we will also be modernized 6th platform so that they can fit in there, two of track tramway. On the occasion of the extension of Route stones will be prepared to enter the streets Grunwaldzka. In the future you will be there to lead the trackway. In the second half of the year will be announced the tender for the contractor both investment. The city is a 235 million zlotys. The whole has to be ready by May 2012.

                                      Visalization:













                                      Now it looks like this:

                                      Comment


                                        #39
                                        I wrote before about plans of new railway station in Poznań. The agreement between Polish Railways and Trigranit developer has just been signed and new train station connected with Poznań Fast Tram Line and Bus Station will be built by april 2012 (firts stage), second there will be commercial spaces.

                                        http://translate.googleusercontent.c...4H8wCZTxGZe70w

                                        Train station like a dream
                                        2010-04-12

                                        The new main railway station - in the first place and some commercial shops, hotel and offices - in the second, created near the building out of a functioning railway. Construction of the Integrated Transport Centre will start later this year. Currently, each party to the agreement, initial the document. It will take at least until the end of the month.

                                        As agreed between the purchaser - Railway Station, and the contractor company - Trigranit Act includes provisions on the scope of planned work, the deadlines for their implementation and possible solutions in case of delays in construction of run organization of UEFA EURO 2012 ™. The guarantee of acceptance from fans in appropriate conditions in 2012 is the record talking about the old building, renovate the station in case the contractor encountered problems related to the timely construction of a new facility. Deadline to assess and take any action set for August 2011.

                                        The agreement specified that by April 2012, prepared and put into service is to be part of the service - particularly important for services such as travelers' station building - the lobby and the cashiers and the bus terminal. It is part of an investment budget of the contractor's fee - Trigranit company, in exchange for profits from the construction of the rest of the business. This is to be built in subsequent years, the site of the current station building.

                                        The modern station building in cross-section will resemble ultra locomotive. Round mass covered by the glass, will be bright and spacious. The lobby and money is scheduled at 1, which will lead to the entrance Dworcowy bridge. To the platforms at 0 you can get to the escalator.

                                        The project will cost a total of several hundred million zlotys. III is currently being renovated train station platform and tracks - as standard Poznan railway junctions.








                                        Comment


                                          #40
                                          New Solaris Tramino, which is expected to MPK Poznan, done a test drive at night. In Poznań of course.




                                          From 19-03-2010
                                          Paskutinis taisė pzlotnik; 2010.04.13, 20:15.